Connecting ethnic minorities and farmers to the GMS economic corridor

 

Detailed Design and Documentation

The Northern Mountain Provinces Transport Connectivity Project (NMPTCP), a collaboration with the Asian Development Bank (ADB) and the Ministry of Transport (MOT), is a USD245 million project that aims to improve transport connectivity in the poor provinces of Northwest Viet Nam. The Project will upgrade two national highways and two provincial roads with approximately 199 km in length, better connecting Lai Chau, Lao Cai and Yen Bai provinces to the Greater Mekong Subregion economic corridor. The activity will have a direct impact on local livelihoods, providing new opportunities for trade and better access to education and healthcare facilities.

  • BUDGET: AUD 6.1 million
  • ACTIVITY OWNER: PMU2
  • OTHER AGENCIES INVOLVED:ADB, TCQM, PPCs Lao Cai, Yen Bai, Lai Chau
  • OUTPUTS:Detailed Engineering Design and related documentation to lead to the construction phase
     

Strategic Intent 

Share this page

NMPTCP-icon1

Ensure the safeguard components of the project are comprehensively addressed, including environmental risks, gender, social inclusion, resettlement and ethnic minority development.

NMPTCP-icon1

Finance the pre-construction requirements to reduce the ADB loan, including detailed engineering design, and the required social dimensions of the project.

NMPTCP-icon2

Increase Road Safety and Climate Resilience, reducing risks and vulnerabilities associated with landslide, rockfall, flooding, wild fire, and temperature and precipitation increase.

icon4-grey

Support sustainable growth of Vietnam’s transport infrastructure sector, contributing to economic development and poverty alleviation.

Follow us on Facebook

Activity components

The activity is divided into several components, which will be undertaken through different phases and stages, and each one of those comprising several tasks and requiring strong collaboration between stakeholders. The activity components in which the NMPTCP activity is divided are the following:

Consulting services for detailed engineering design, bidding documents, tree replanting (Activity RAP & PACOF), HIV and Human Trafficking Awareness Program (Activity HHTAP)

1. SUPPORT TO PROJECT IMPLEMENTATION

Consulting services for detailed engineering design, bidding documents, tree replanting (Activity RAP & PACOF), HIV and Human Trafficking Awareness Program (Activity HHTAP)
Consulting services for detailed engineering design, bidding documents, tree replanting (Activity RAP & PACOF), HIV and Human Trafficking Awareness Program (Activity HHTAP)

1. SUPPORT TO PROJECT IMPLEMENTATION

Consulting services for detailed engineering design, bidding documents, tree replanting (Activity RAP & PACOF), HIV and Human Trafficking Awareness Program (Activity HHTAP)
Considering slope protection, cross-drainage, vertical and horizontal road signage, during the preparation of the DDD

2. CLIMATE RESILIENCE AND SAFETY

Considering slope protection, cross-drainage, vertical and horizontal road signage, during the preparation of the DDD
Considering slope protection, cross-drainage, vertical and horizontal road signage, during the preparation of the DDD

2. CLIMATE RESILIENCE AND SAFETY

Considering slope protection, cross-drainage, vertical and horizontal road signage, during the preparation of the DDD
Reviewing the current program and piloting new approaches for controlling vehicle overloading (Activity ALCP).

3. VEHICLE OVERLOADING

Reviewing the current program and piloting new approaches for controlling vehicle overloading (Activity ALCP).
Reviewing the current program and piloting new approaches for controlling vehicle overloading (Activity ALCP).

3. VEHICLE OVERLOADING

Reviewing the current program and piloting new approaches for controlling vehicle overloading (Activity ALCP).
Designing a risk mitigation plan and a road safety awareness campaign (Activity RSAC)

4. ROAD SAFETY

Designing a risk mitigation plan and a road safety awareness campaign (Activity RSAC)
Designing a risk mitigation plan and a road safety awareness campaign (Activity RSAC)

4. ROAD SAFETY

Designing a risk mitigation plan and a road safety awareness campaign (Activity RSAC)