CHCIP
Boosting shared prosperity and enabling growth in Central Vietnam
Detailed Design and Documentation
The Central Highlands Connectivity Improvement Project (CHCIP), a collaboration with the World Bank (WB) and the Ministry of Transport (MOT), is a USD154 million project contributing to the development of the Asian Highway system through the upgrade of 150 km of National Highway 19 (NH19). The project will facilitate connection with neighbouring countries and strengthen the transport and logistics connectivity from the Central Highlands to the Central Coastal Provinces. Aus4Transport is funding and directly assisting with the Detailed Engineering Design, the procurement documentation and the environmental and social planning.
- BUDGET: AUD 3.5 million
- ACTIVITY OWNER: PMU2
- OTHER AGENCIES INVOLVED: WB, PPCs Binh Dinh and Gia Lai
- OUTPUTS:Detailed Engineering Design and related documentation to lead to the construction phase
Strategic Intent
Activity components
The activity is divided into engineering and non-engineering components, both of them being undertaken through different phases and stages, and each one of these components comprising several tasks and requiring strong collaboration between stakeholders. The activity components in which the CHCIP activity is divided are the following: